Installation of Plant:


  •  During unloading of material we are taking utmost care of materials with proper safety precaution.


  •  As per Plant lay out marking structure and panel mounting will be done.


  •  Inverter mounting to be done at safe location even though its weather proof.


  •  Making cable string in such manner that DC losses will be minimize.


  •  Earthing of structure and inverter will be preferably done by using cable earthing as per recommendation.


  •  Cable route up to meter (Inverter to ACDB) is arranged to minimize AC losses.